Establishes standard configurations for vapor recovery lines on DOT 407 and DOT 412 cargo tanks. These configurations provide for top (on the tank) and bottom (near the tank outlet) vapor recovery. This RP is not intended to address the retrofit of vapor recovery systems on existing cargo tanks.
October 2021 Edition
Remember Me
9/18/2025Tank Engineering Publications Update - September 2025
9/18/2025Engineering Publications Update - September 2025
9/30/2026 » 10/2/2026TTMA 2026 Fall Board and Convention Planning Meeting
10/20/2026 » 10/22/2026TTMA 2026 Fall Engineering Committee Meeting Hosted by Haldex SAF-Holland